Design | We are experienced in custom and phased FTTP deployments. | Home Run Architecture Designs
PON Architecture Designs
Hard Spliced Designs
Connectorized Designs
Aerial and Buried deployments
Cost Comparisons and Analysis |
Inspection Services | Our staff’s experience and job knowledge will protect your investment – even as it is being constructed. We use X-paper for detail and timeliness, and document construction details down to what equipment was used on a project. | Experience with many construction methods
Detailed record keeping
Maintains construction standards
Weekly reporting to client on progress |
Mapping | Maps are critical to maintaining and managing your new plant. We provide detail, clarity, and accuracy you can rely on. | As-Built maps and staking sheets
Digitize existing maps and staking sheets
Digital archiving
GPS Existing or New Plant for accuracy of records |
OSP Inventory | From beginning to end, we’ll ensure, verify, and document that your plant was built correctly. | Evaluation of existing plant
Validate newly installed plant |
Plans and Specifications | We ensure our clients get the best contractor pricing. | Detailed Contract Guide Drawings
Bid evaluations
Customized for Each Client/Project |
Right of Way (ROW) Acquisition | Our team will navigate and fulfill ROW, easement, and environmental requirements. | State, County, Federal, and Railroad Rights of Way
Department of Natural Resources
Bureau of Reclamation
Private easements
Storm Water Pollution Prevention Plan (SWPPP)
Environmental Impact Studies
Borrower’s Environmental Reports (BER) |
Staking Services | Good information from the field eliminates waste and builds a better network. Clarity, detail, and GIS-accuracy on maps give you the best construction bids. | Familiar with all RUS/RDUP Standards
Fully Electronic Field Staking
Buried and Aerial Plant
Familiar with Several Staking Software Solutions
Road Moves, including redesigning networks around road cuts and altered right of ways |
Testing | We’ll verify that your network works the way it should, with no high-loss anomalies. | Shield megging
Power Meter and OTDR testing of Fiber Plant |